MAINTENANCE, REPAIR AND
REPLACEMENTS
2017 Maintenance Projects - Completed
Replacement retaining wall
north
Replacement retaining wall
south
2016 Maintenance Projects - Completed
Boathouse roof and fascia replaced
Boathouse chimney renovated
------------------------------------------------------------------------------------------------------------------
Revised
maintenance plan for 2016 (multi-year approach) - Letter to lot owners
SLE Maintenance & Repair and
Budgeting = Multi-Year Plan
8/17/16 Lot owner
meeting files, 2016 Maintenance Plan - Five Year Budget Plan
Power Point
Presentation 8/17/16
Parking Lot Testing Report
9/12/16 Lot owner meeting files,
2016 Maintenance Plan - Five Year
Budget Plan
Power
point -Revised 2016 maintenance plan 9/12/16
Engineer letter on condition of two SLE retaining walls
SLE Trustees appreciate the input and support from the
lot owners meetings on 8/17/16 on the
'SLE Maintenance & Repair
Project / Five Year Budget Plan' and again on 9/12/16. SLE
Trustees met on Thursday 8/18/16 to discuss the comments and suggestions made
on 8/17/16.
The SLE Trustees have broken the 2016 Maintenance & Repair Project into phases over a couple
years - with the highest priority needs first. (i.e. phase 1) There may be a water shed /
water quality element added to the future parking lot
and/or park repairs.
...............................................................................................................................................
NOTE:
SL Village has hired a contractor to replace its storm water sewer pipe under
SLE boathouse parking lot. Work is scheduled for October 2016. (lake level is
reduced). No direct expense to SLE.
..........................................................................................................................................
Several maintenance issue were identified by SLE'S lot owner based
Facilities Planning Committee 2004 though 2010 and corrections
were planned for 2010 - 2011 as noted in the 2004 - 2010 SLE Newsletters
and other letters to the lot owners. Property conditions in 2015 are the
same or in most cases are worse.
2015 MAINTENANCE ISSUES
- Retaining wall boathouse to swimming dock - 90+ yrs old and failing
- Retaining wall north end of the park - estimated 40-50
years old - failing
- Boathouse roof - leaking due to age
< replaced in spring of 2016 >
- Boathouse chimney
- adding to roof leak and structural
issue (above the roof line)
- Boathouse walls and floors in poor condition
due to use of only 32" deep footer,
location next to a lake and storm water run
off from parking lot and from the park.
- Boathouse sanitary sewer line - too shallow, subject to blockage and
breakage
- Parking lot - blacktop not properly installed 50 yrs ago, damaged,
incorrect grading
- Parking lot curbs and retaining walls- constructed with used RR ties
40+ years ago
- Parking lot - need sidewalk for safety for people to walk
away from traffic
- Picnic pods - concrete slabs (some of the picnic pod
retaining walls have been replaced)
- Picnic pods - wooden retaining wall starting to fail
- Need replacement trees for those removed after
lightning or insect damage
- Children's playground - needs additional repairs and
replacement equipment
- Government regulations and Codes (village, county, region
and Federal) impact
maintenance, repairs and replacements
choices.
- Wheel chair access to the picnic pods, etc. is very limited
- Other safety issues need to be addressed in the park
property
NOTE: SLE trust requires the proper maintenance of the
property by the Trustees
1920 - 2015 MAINTENANCE:
Original designs, prior maintenance choices, budget limitations impact the
appearance
of our boathouse and park . Some prior maintenance decisions since 1920 were
based
on the lowest 'first cost', not life cycle cost (i.e. installation of used RR ties,
only a top coat of blacktop was used 50 years ago)
BOATHOUSE : Roof, Foundation and Walls -
PHOTOS
Boathouse West wall
Fireplace roof leak
Ladies room ceiling
Ladies room countertop
Ladies room floor
Men's room floor
Men's room floor 1
Men's room floor 2
Bathroom1
Ping-Pong room roof leak
Boathouse footer
Boathouse footer1
Boathouse footer2
Boathouse wall
Guard Room Wall
Ping Pong room
wall
Roof1
Roof lakeside
Roof south end
< prior structural roof issues have been resolved
>
Boathouse Roof S
Boathouse Roof N
Boathouse Roof IR1
Boathouse Roof IR2
Boathouse Roof IR3
Boathouse Roof IR4
PARKING LOT
Curb1
Curb2
Parking Lot1
Parking Lot2
Parking Lot3
Parking Lot4
2015 Parking Lot1
2015 Parking Lot2
2015 Parking Lot3
2015 Parking Lot4
2015 Parking Lot5
2015 Parking Lot6
2015 Parking Lot7
2015 Parking Lot8
2015 Parking Lot9
2015 Parking Lot10
2015 Parking Lot11
2015 Fishing Dock1
Chimney1
Chimney2
Chimney3
Chimney4
Chimney5
Chimney6
PICNIC PODS
picnic pod1
picnic pod2
Picnic pod3
2015 Picnic Pod1
2015 Picnic Pod2
2015 Picnic Pod3
RETAINING WALLS
Retaining wall1
Retaining wall2
Retaining wall3
2015 Children's
Playground1
2015 N Retaining
wall 1
2015 N Retaining
wall 2
2015 Side walk near
playground 1
2015 Sidewalk near SL Blvd
BOAT RAMP AND DOCK
Boat ramp1